Our Facilities
Built for efficiency and speed
From the very beginning, the modern facilities, which were built in 2001, have been designed for a highly efficient workflow. The 7,500 m² hangar has direct access to the adjacent engine shop and to 10,000 m² of fully equipped, state-of-the-art workshops on the same level. Together with the skills of the team, this enables most of the work to be kept in-house, without the need to involve third parties. This results in high flexibility and very competitive turnaround times. A large warehouse area guarantees immediate access to a large stock of consumables and expendables. Due to the well-developed supply network of Lufthansa Technik, any material requirements exceeding the stock on hand can be satisfied quickly and reliably.